POWER SECTOR

Construction of treatment plant, DM water storage tank, generation water reservoirs, roads, storm water drainages,raw water pipe line 1800 /1300/1200-millimeter diameter pipe line laying 60 kilo meters. Valve controlling chambers, valve erections, line testing and commission works, construction of Heavy Capacity Pumping per hour 5000 m3 or 50,00,000 litters, construction of Heavy Capacity Pumping per hour 7500 m3 or 75,00,000 litters, construction of major river crossing pipe rack bridges 1000 Km at Hasdeo river Chhattisgarh state, boiler turbine area equipment foundations, coal handling system works.